WO – 801 / RAB Construction of OHTL & UG Cable for Rabigh – 2S/s at Jeddah Subcontract for Access Road & Structure Pad.

Overview: The WO – 801/RAB project stands as a significant achievement for Waqas Anayat Co Ltd, showcasing our expertise in constructing overhead transmission lines (OHTL) and underground (UG) cable networks. This project was initiated on June 26, 2012, as a subcontract for the esteemed Al Sharif & KEC Group, marking another successful collaboration.

Scope and Innovation: The project entailed the construction of an overhead transmission line and an underground cable network to facilitate power transmission from Rabigh to the 2S/s at Jeddah. Additionally, the subcontract included the development of access roads and structure pads, emphasizing our comprehensive approach to infrastructure development.

Key Achievements:

  • Integrated Infrastructure: By seamlessly integrating the construction of OHTL, UG cable networks, access roads, and structure pads, the project ensured a holistic and efficient power transmission system.
  • Adherence to Standards: Our team diligently adhered to industry standards, ensuring that each aspect of the project met or exceeded quality benchmarks.
  • Timely Completion: The project was executed within stipulated timelines, demonstrating our commitment to punctuality and project delivery.

Outcome: The successful completion of the WO – 801/RAB project is a testament to Waqas Anayat Co Ltd’s dedication to delivering comprehensive and efficient power transmission infrastructure. It underscores our ability to handle multifaceted projects with precision and expertise.

AL Sharif & KEC Group
26/06/2012
2113114400